Guangzhou Regenerative Medicine and Health Guangdong Laboratory (GRMH-GDL)
Guangzhou Regenerative Medicine and Health Guangdong Laboratory (GRMH-GDL)
General News
Home >> News >> General News
Guangzhou Regenerative Medicine and Health Guangdong Laboratory LEDY Campus Renovation Work Completed
Release time:2019-09-05

 

After 180 days work, Guangzhou Regenerative Medicine and Health Guangdong Laboratory (GRMH-GDL) LEDY Campus laboratory building successfully completed the renovation process in 22nd August. Huang Jianchong, Director of GRMH-GDL Infrastructure Office, hosted the opening conference. Representatives of designer, engineering project supervisor, construction and Guangzhou Institutes of Biomedicine and Health, CAS attended the conference.

1.jpg

 

After introduced the basic construction of GRMH-GDL, Huang Jianchong presented the space plan, function demonstration of the program, as well as the construction process during the past year. The total built-up area of LEDY Park reached more than 11000 square meters.


2.jpg

 

LEDY Building includes closed research area and public office area. In order to fulfill the requirements of researchers on experiment and academic communication, the building plans with standard laboratory, PI office, RA office, instrument center, meeting room, academic hall, administrative office, library and café. The research area is equipped with national leading laboratory standard, which adopts unified gas transmission pipeline, and pure water transports to experimental table through transmission pipeline, while waste water will be disposed timely and internet is accessible to the experimental table. The building is planning totally 18 research teams to work in, each floor of the building will take in 3 core team (includes 20-30 members each).

 

 

Latest News